Sue Goldberg

Office Manager

Hometown: Redwood City, CA

Hobbies: Enjoys good food and wine; loves the outdoors, hiking, horseback riding, and quiet time with her two Westie dogs

Sue Goldberg

Office Manager

About Sue Goldberg:


Sue was born and raised in Redwood City, CA (also home to the Red Morton Park, which is known as 7-11 because from 1956 to 1988 it was the training complex for the San Francisco 49ers). She moved to NJ after college and spent over 20 years in the banking industry. Sue is the mother to one son and one daughter. She loves working at PDQ Restoration because she can help people in a time of great need and anxiety.

Jobs Completed by Sue Goldberg

See All

Jefferson, NJ

December 2, 2023

PDQ first located and had the pipe fixed so no more water would be leaking. After this all of the water was extracted. Then all surfaces were cleaned that came in contact with the water. Fans and dehumidifiers were set up to completely dry out the basement and bring it back to its original condition.

Morristown, NJ

September 5, 2023

The team worked to control the damage and remove standing water. Water pumps and vacuums were placed to remove water. The drying equipment was left on site until the area was completely dry to avoid mold growth and mildew.

Short Hills, NJ

August 1, 2023

PDQ arrived on the scene in response to an emergency after-hours call. PDQ completely cleaned and sanitized all affected areas. PDQ restored the unit back to liveable conditions.

Andover, NJ

July 27, 2023

We placed 2 dehumidifiers and 1 air scrubber on both the affected first-floor and second-floor areas. PDQ Started moisture logs. The walls and ceiling in the yoga room were partially wet. A portion of the ceiling drywall was removed along with the wet insulation. The wall that is shared with the front foyer had insulation and drywall that was wet and it was also removed. Numerous stained ceiling tiles were removed and thrown away. Additional ceiling tiles were removed from the front foyer. Laminate flooring was removed along with padding and tarpaper. Fans were installed once all the demolition was completed.