Job completed for David Z. - Chester, NJ - Water Damage
Completion date: July 13, 2026
Location: Chester, NJ
Solutions provided:
PDQ responded to a commercial loss at an OPS female locker room in Chester, NJ after a clogged shower drain caused wastewater to overflow across the locker room floors. By the time of our arrival, the drain had already been cleared by a third-party plumbing contractor, allowing our team to focus on the cleanup and sanitization of the affected space. During the inspection, we determined that several lockers, workstations, and appliances would need to be temporarily relocated so all impacted surfaces could be properly accessed and cleaned.
Our technicians completed a comprehensive cleaning and disinfection of the affected areas in Chester, NJ using professional-grade sanitizing products appropriate for the environment. Floors, lockers, chairs, workstations, and appliances were carefully cleaned before all contents were returned to their original locations. The area was inspected to confirm the cleaning process had been completed thoroughly and that the locker room was ready for continued operation. The facility in Chester, NJ was left clean, sanitized, and prepared for normal daily use.
Team members on this project:
Jerry Katz